VRF AND CHILLED WATER SYSTEM installation.
Installation of refrigerant piping and communication cables, pressure testing, vacuuming, gas charging etc
Installation of ducts for fresh air, exhaust air , ventilation and toilet exhaust ducts.
Installation of accessories and related machines.
Testing and commissioning of the entire system.
Preparing as built drawing defining the modifications
Supply of man power.
Maintenance for one year after installation



